In 2020,The First Domestic Complete System Construction Project of Steam Drying+Pyrolysis Carbonization Process Route was Successfully Put into Operation

In May 2020, a sewage treatment plant in Dongguan was successfully put into operation, and the first complete system of steam drying+pyrolysis carbonization process in China was constructed.

MORE

In 2016,Two Dryers in Parallel were Successfully Put into Operation in Foshan Jialida

Successfully put into operation in November 2016 at Foshan Jialida Environmental Protection Technology Co., Ltd. with two parallel sludge dryers.

MORE

In 2016,The First Domestic Oily Sludge Drying Project was Successfully Put into Operation

In 2016, the first domestic oily sludge drying project was successfully put into operation at Customer: China Petroleum Chemical Co Jiujiang Branch. The oily sludge becomes powder after drying, with a moisture content of about 20% and a calorific value of 3200kcal/kg.

MORE

In 2013, Sri Lanka successfully put into production 2 dryers

Jacobi Carbons Lanka(PVD)Lid,Sri Lanka ,In May 2013, we purchased two dryers from our company for the drying of activated carbon sludge, using high-temperature thermal oil as the heat source.